PROJECTS

 

  • Construction of an additional safety valve lock.
  • The hinged arm of the sight glass for the tank 31-1.
  • Design of the cooling equipment roofing in the building No. 26.
  • Press for edge seals.
  • Modernization of the pipeline NaOH.
  • Pump rinsing line after NaOH.
  • The pipeline for disposal of waste water.
  • A set of service platforms.
  • Assembly table.
  • Dust removal system on the production line L1 i L2.
  • The concept of a tank for transporting liquid fertilizer.